Decision of the European Ombudsman on complaint 1858/2005/BB against the European Monitoring Centre for Racism and Xenophobia
Decision
Case 1858/2005/BB - Opened on Thursday | 23 June 2005 - Decision on Monday | 16 July 2007
Summary of decisions on complaints 1858/2005/BB and 1859/2005/BB against the European Monitoring Centre for Racism and Xenophobia (EUMC)[1]
The complainant asked Mr D., a Head of Unit in the European Monitoring Centre for Racism and Xenophobia ("EUMC"), to explain why his offers in response to two Open Calls for Tender had been unsuccessful. Mr D. replied to the first request, but he did not reply to the complainant's subsequent requests to know the identity of the winning organisation and the cost of its offer and to obtain a comparison of the rating grades and the scores of his offers and the winning offers. In the first complaint, the complainant also argued that the EUMC had failed to apply transparent criteria.
According to the EUMC, the requests were not addressed to the designated contact person, and ought to have been sent by ordinary or registered mail, not by e-mail. It made a general reference to receiving approximately 300 "spam" e-mails per day. It referred to the contract award notice for the name of the winning offer and the cost of its offer and provided the rating grades and explanations, maintaining that the procedure had been transparent.
The Ombudsman was not satisfied with the EUMC's explanations. In this regard, he recalled that the Administration is required to provide the requested information unless there are valid and adequate grounds for not doing so. Moreover, after receiving requests for information on matters for which he or she is not responsible, an official should either (i) provide the contact references of the person responsible or (ii) forward the request directly to the person responsible. Neither of these steps was taken in the present case. Further, the Ombudsman observed that the purpose of an obligation of transparency is to enable verification that the principle of equal treatment of tenderers has been respected and to facilitate review of the impartiality and integrity of the procurement procedures. Relatedly, the duty to provide reasons addresses the need to ensure an appropriate level of transparency in contract-awarding procedures[2].
The Ombudsman therefore made proposals for friendly solutions requesting the EUMC to provide adequate information on the compared scores and adequate explanations regarding the transparency of the first tender procedure or, alternatively, reasonable compensation.
[1] The Ombudsman notes that in accordance with Article 33 of Council Regulation (EC) No 168/2007 of 15 February 2007, the EUMC ceased to exist with effect from 1 March 2007 and its role is thereafter carried out by the European Union Agency for Fundamental Rights.
[2] Cf. Case C-92/00, HI, ECR [2002] I-5553, paragraph 46.
Strasbourg, 16 July 2007
Dear Mr C.,
On 5 May 2005 you submitted a complaint to the European Ombudsman on behalf of the European Roma Rights Centre ("ERRC") against the European Monitoring Centre for Racism and Xenophobia ("EUMC"). The complaint concerns the EUMC's decision not to retain the ERRC's bid in Open Call for Tender N° 2004/02/13 - Comparative analysis on Roma, Sinti, Gypsies and Travellers in public education.
On 23 June 2005, I forwarded the complaint to the Director of the EUMC. The EUMC sent its opinion on 30 September 2005. I forwarded it to you with an invitation to make observations, if you so wished.
No observations were received from you.
On 15 December 2006, the Ombudsman services contacted you in order to request your approval for a friendly solution proposal, which you gave on 19 December 2006.
On 21 December 2006, I addressed a proposal for a friendly solution to the EUMC. You were informed accordingly the same day.
The EUMC sent its opinion regarding this proposal on 14 February 2007.
On 6 March 2007, I forwarded the EUMC's letter of 14 February 2007 to you with an invitation to make observations.
On 11 April 2007, you submitted your observations on the EUMC's reply to my proposal for a friendly solution.
I am writing now to let you know the results of the inquiries that have been made.
I apologise for the length of time it has taken to conclude my inquiry into your complaint.
THE COMPLAINT
By letter dated 21 March 2005, the Head of Research and Data Collection at the European Monitoring Centre for Racism and Xenophobia ("EUMC") informed the complainant that his offer, submitted on behalf of the European Roma Rights Centre ("ERRC"), in the context of Open Call for Tender N° 2004/02/13 - Comparative analysis on Roma, Sinti, Gypsies and Travellers in public education ("Open Call for Tender N° 2004/02/13"), had not been successful and that the EUMC had decided to choose another offer.
Subsequently, on 25 March 2005 the complainant sent an e-mail to Mr D., Head of Research and Data Collection at the EUMC, requesting an explanation as regards the grounds for the refusal of his bid.
On 25 March 2005, Mr D. replied that "[t]he reason for the rejection of the ERRC bid was the result of the evaluation by the selection committee on the basis of the quality criteria described in the tender specifications in relation to price (quality 50% - price 50%). If you require more detailed information, [Mr A.], our procurement officer, will provide you with it."
On 29 March 2005, the complainant sent an e-mail to Mr D. requesting to know:
- which organisation or entity had been awarded the contract and what its cost offer was; and
- the "rating grades and how [his] offer scored on various grounds compared with the winning bi[d]."
However, he did not received any response to his e-mail of 29 March 2005. Hence, he considered that the EUMC had failed to provide him with a suitable explanation for the rejection of his bid and turned to the Ombudsman.
In his complaint, the complainant alleged that the EUMC
- failed to reply to his request for further information concerning the outcome of Open Call for Tender N° 2004/02/13; and
- failed to establish and apply transparent award criteria in Open Call for Tender N° 2004/02/13.
In support of the second allegation the complainant argued that the EUMC had failed to make the "quality/price ratio" public at the time the Open Call for Tender N° 2004/02/13 was issued. In this regard, he argued that a quality/price ratio had been made public in another Call for Tender, namely, Restricted Call for Proposal N° EUMC 2004/02/16 Comparative Analysis on Discrimination and Racism in Housing. The quality/price ratio applied in that call for tender was 70/30. The complainant also argued that Open Call for Tender N° 2004/02/13 created the impression that the primary criteria for evaluating the applications would be expertise-oriented. This impression was created by the fact the expertise-oriented criteria were given precise numerical weightings, whilst no weighting was given as regards the quality/price ratio.
The complainant claimed that the EUMC should:
- annul contracts based on Open Call for Tender N° 2004/02/13 and open a new Call for Tender;
- publicly acknowledge the acts of maladministration; and
- award damages to the complainant.
THE INQUIRY
The EUMC's opinionAs regards the first allegation, the EUMC made the following remarks.
The EUMC informed the complainant, by letter dated 21 March 2005, that his application for Open Call for Tender N° 2004/02/13 had not been successful and that the it had decided to choose another offer.
The complainant requested, by e-mail dated 25 March 2005, to be informed of the grounds for the refusal of his bid. The EUMC explained, by e-mail dated 25 March 2005, that the complainant's bid was rejected after an evaluation carried out by the Selection Committee. In relation to its reply, the EUMC emphasised that it sent its e-mail within five hours of receiving the complainant's request. The Selection Committee's evaluation was based on the quality criteria described in the tender specifications. The results of the evaluation carried out in relation to each bid were then compared to the price offered by the entity making that bid. The EUMC also gave the contact details of a person who could respond to further requests for information.
The EUMC underlined that the 24 control standards applied to the EU institutions foresee that each institution must systematically register incoming and outgoing e-mail to enable the efficient monitoring of deadlines and must maintain a comprehensive and up-to-date filing system which is accessible to all appropriate staff.
The complainant's e-mail containing the request for additional information was unfortunately, not addressed to, and was, therefore, not received by, the contact person designated by the EUMC. In this respect, the EUMC pointed out that it receives approximately 300 "spam" e-mails per day.
The EUMC was of the opinion however that formal requests for information on procurement procedures should be sent by regular or registered mail, and not by e-mail. The EUMC mentioned that it applies this policy to outgoing information sent to companies involved in procurement procedures. Respect for this procedure ensures timely registration and processing of requests for information by the EUMC.
The EUMC pointed out that some of the information requested, such as the name of the winning bidder and the price of the winning bid, could be found in the contract award notice 2005/S80-077082 published on 23 April 2005.
The EUMC regretted that no formal reminder to provide the requested information was addressed to it before a formal complaint was submitted to the European Ombudsman.
The EUMC stated that, on 14 July 2005 and after receiving the Ombudsman's letter of inquiry, it provided the requested information to the complainant. It attached a copy of this letter to its opinion relating to the present inquiry. The letter of 14 July 2005 provided additional information as regards the evaluation of the complainant's bid in Open Call for Tender N° 2004/02/13. In this letter, the EUMC underlined that procurement is regulated by the Implementing Rules to the Financial Regulation of the EUMC(1). Moreover, it stated that seven bids were submitted in response to Open Call for Tender N° 2004/02/13. These bids were evaluated by an Evaluation Committee. The evaluation was carried out on the basis of the selection and award criteria published in Open Call for Tender N° 2004/02/13. The results of the Evaluation Committee indicated that the complainant's bid had a quality rating of 83.66 points. The EUMC stated that the quality/price ratio of the complainant's bid was therefore 0.0027414 points. The evaluation results also indicated that the complainant's bid was placed second amongst the seven bids received. In light of the results of Open Call for Tender N° 2004/02/13, the EUMC was advised to contract with the Kurt Lewin Foundation, which had a quality/price ratio of 0.0044760 points. Information on the contract awarded to the Kurt Lewin Foundation was published in the Official Journal of the European Communities. The EUMC attached a print-out of the award notice to its letter.
As regards the allegation that the EUMC did not apply transparent award criteria, the EUMC argued that, in Open Call for Tender N° 2004/02/13, it published all the award criteria and attached the relative weightings for assigning maximum possible points for each of the criteria. The EUMC thereafter announced that the contract would be awarded to the tender which, in accordance with the relevant quality/price ratio, was the most cost-effective. The Vade Mecum on Public Procurement in the Commission of October 2003 (the "Vade Mecum on Public Procurement"), provides, on p. 61, that while technical quality is usually evaluated by means of a mark, the price quoted by a tenderer is an objective element and cannot be marked. Thus, the EUMC decided to apply a simple quality/price ratio, which meant that all quality points were divided by the price. The result reflected quality points per euro spent. According to the EUMC, this was the method it had announced in Open Call for Tender N° 2004/02/13 and was also the method it applied in order to decide the outcome of Open Call for Tender N° 2004/02/13. The EUMC considered that the procedure was transparent.
The complainant's observationsThe complainant appears not to have sent any observations regarding the EUMC's opinion.
THE OMBUDSMAN'S EFFORTS TO ACHIEVE A FRIENDLY SOLUTION
After careful consideration of the opinion and the complainant's observations, the Ombudsman was not satisfied that the EUMC had responded adequately to the complainant's allegations that the EUMC had failed (i) to provide adequate information concerning the outcome of Open Call for Tender N° 2004/02/13, and (ii) to establish and apply transparent award criteria in that Open Call for Tender.
The proposal for a friendly solutionArticle 3(5) of the Statute of the Ombudsman directs the Ombudsman to seek, as far as possible, a solution with the institution concerned to eliminate the instance of maladministration and satisfy the complainant.
The Ombudsman therefore made the following proposal to the EUMC for a friendly solution as regards the complainant's two allegations:
The EUMC could consider:
- providing the complainant with adequate information on "how [his] offer scored on various grounds compared with the winning bi[d]"; and
- adequately explaining, its position that the procedure at issue was transparent with respect to the establishment and application of a "simple quality/price ratio", or, in case it is unable to give such explanations, offering a reasonable compensation to the complainant.
This proposal was based on the following considerations:
As regards the allegation of failure to reply/provide information:The Ombudsman, first, noted that principles of good administration require that the Community Administration provide members of the public with the information they have requested, unless it invokes valid and adequate grounds for not doing so.
Moreover, the principle of equal treatment of tenderers, which is a general principle of Community law(2), implies the existence of an obligation of transparency, the purpose of which is to enable verification that the principle of equal treatment of tenderers has been complied with and to ensure a degree of advertising sufficient to enable the Community Courts and the Ombudsman to review the impartiality and integrity of the procurement procedures(3). Relatedly, when it comes to a decision to award a tender, the duty to provide reasons, which is enshrined in Article 253 of the EC Treaty, addresses the need to ensure an appropriate level of transparency in the contract-awarding procedures(4).
The Ombudsman noted therefore that although Mr D. had suggested to the complainant to contact its procurement officer, Mr A., if he wished to receive more detailed information, the request made in the complainant's e-mail of 29 March 2005 was nonetheless sent to Mr D. and not to the official suggested by Mr D. The EUMC did not deny that Mr D. received this e-mail as an ordinary, that is non-"spam", e-mail but it simply referred, in general terms, to the number of "spam" e-mails it receives per day. Moreover, the Ombudsman also noted that the complainant sent an e-mail to Mr D. on 25 March 2005, to which the latter replied on the same date. On the basis of the information provided to the Ombudsman, there was no indication that this earlier e-mail had been screened as "spam". In this respect, the Ombudsman recalled that principles of good administration require that an official receiving requests for information on matters for which he is not responsible should either (i) direct the person making the request to the person responsible for dealing with such matters, by providing the name and contact references of that person, in accordance with Article 22(4) of the European Code of Good Administrative Behaviour. or (ii) forward the request directly to the person responsible for such matters. Neither of these steps was taken in the case at hand.
Moreover, the EUMC has not referred to any specific applicable rules supporting its argument that formal requests for information on procurement procedures should be sent by regular or registered mail and not by e-mail. In this regard, it must be recalled that Mr D. did reply to the complainant's e-mail of 25 March 2005 containing a request for information concerning the grounds for the rejection of the complainant's bid. Further, the above argument, to the extent that it is based on the need to ensure the timely registration and processing of requests by the EUMC, is not supported by the EUMC's other argument that the 24 control standards applied to the EU institutions foresee that each institution must systematically register incoming and outgoing e-mails to enable the efficient monitoring of deadlines and must maintain a comprehensive and up-to-date filing system which is accessible to all appropriate staff.
The Ombudsman further observed that, in any event, the EUMC was informed of the complainant's request at issue through his complaint to the Ombudsman, which was communicated to the EUMC, together with its annexes. Nevertheless, it is rather clear that the EUMC failed adequately to reply to this request, since the information provided in the EUMC's opinion on the complaint and in the EUMC's letter of 14 July 2005 to the complainant does not refer to "how [the complainant's] offer scored on various grounds compared with the winning bi[d]." In this regard, it must be noted that the part of Open Call for Tender N° 2004/02/13 which has been annexed to the complaint(5) defines four award criteria of a qualitative nature and specifies the maximum points to be awarded for each one of these criteria (40/100 for the first, 40/100 for the second, 10/100 for the third and 10/100 for the fourth).
In light of the above, the Ombudsman considered that (i) none of the points made in the EUMC's opinion adequately explained the EUMC's failure to reply to the complainant's request, before the lodging of his complaint to the Ombudsman, and (ii) the EUMC has not provided information on the points awarded to the complainant's offer and to the selected offer, with respect to each one of these criteria.
As regards the allegation of failure to establish and apply transparent award criteria in Open Call for Tender N° 2004/02/13The Ombudsman noted that the EUMC has not made reference to any provisions in Open Call for Tender N° 2004/02/13 concerning the precise determination of the quality/price ratio.
Furthermore, the Ombudsman noted that Open Call for Tender N° 2004/02/13 did not appear to refer to the precise weighting of the award criterion concerning price in relation to the award criteria concerning qualitative factors. In addition, the EUMC did not made reference to any such provisions, relating to the determination of the quality/price ratio, to be found in the Implementing Rules to the Financial Regulation of the EUMC mentioned in its letter of 14 July 2005 to the complainant. It has simply referred to a point made in the Vade Mecum on Public Procurement, according to which the price offered by a tenderer is an objective element and cannot be marked, without explaining the legal value and relevance of this reference. In this regard, it must be noted that the above point does not seem to address the issue of the quality/price ratio, when the award is to be made to the "economically most advantageous" (or to the "most cost-effective") tender.
Under these circumstances, the Ombudsman considered that the EUMC's argument (formulated in general terms) that in Open Call for Tender N° 2004/02/13 it published all the award criteria and attached relative weightings for assigning maximum possible points for each of the respective criteria, does not seem to be correct.
The Ombudsman also noted the EUMC's statement, contained in its opinion, that it "[t]hus, ...decided to apply a simple Quality/Price ratio, which meant that all quality points were divided by the price and the result reflected quality points per [euro] spent. This was the method announced by the EUMC and this was the method applied by the EUMC to decide the outcome of this open call for tender." However the EUMC's references to the Call and to the Vade Mecum on Public Procurement do not explain its decision to apply a "simple quality/price ratio". Moreover, the EUMC has given no information whatsoever in support of its argument that "this was the method announced by the EUMC" (emphasis added). In addition, the EUMC has not specified when and how it decided to apply a simple quality/price ratio and when and how it communicated this decision to the parties concerned. The EUMC has also not addressed the complainant's argument that this quality/price ratio had been made public in another Call for Tender, namely, Restricted Call for Proposal N° EUMC 2004/02/16 Comparative Analysis on Discrimination and Racism in Housing, under which the ratio was 70/30. Nor has it addressed the complainant's argument that the wording of Open Call for Tender N° 2004/02/13 suggested that the primary criteria for evaluating the tenders would be of a qualitative nature.
In light of the above, the Ombudsman considered that the EUMC's statement, contained in its opinion, that the procedure at issue was transparent, with respect to the establishment and application of a simple quality/price ratio, is not convincing.
The Ombudsman also recalled that t he principle of equal treatment of tenderers is a general principle of Community law(6). This principle implies the existence of an obligation of transparency, aimed at making it possible to verify that the above principle has been complied with and at ensuring a degree of advertising sufficient to enable the Community Courts and the Ombudsman to review the impartiality and integrity of the procurement procedures(7). More specifically, this means, inter alia, that the award criteria stated in a tender notice must be formulated in such a way as to allow all reasonably well-informed and normally diligent tenderers to interpret them in the same way(8). Furthermore, the relative importance, that is, the weighting, of the award criteria to be taken into account by the contracting authority in identifying the economically most advantageous offer must be specified in the tender notice or tender documents referred to in the tender notice, at least where: (i) the decision on this matter has been made at the time of the issuance of the call for tender or of the relevant tender documents referred to in the tender notice(9); or (ii) the decision on this issue contains elements which, if they had been known at the time the tenders were prepared, could have affected that preparation(10). Moreover, the decision on this subject will not be compatible with Community law if it is adopted after taking into account elements, or, more generally, circumstances likely to give rise to discrimination against one of the tenderers(11).
In light of the above, the Ombudsman concluded that the EUMC failed to submit any arguments or evidence adequately supporting its rejection of the complainant's allegation and relevant argumentation. He also concluded that the EUMC failed to show, in any way, that the establishment of the "simple quality/price ratio", on the basis of which it identified the economically most advantageous offer in this case, was consonant with the Community law requirements concerning transparency in the context of tender procedures.
The EUMC's reply to the Ombudsman's proposal for a friendly solutionIn its reply to the Ombudsman's proposal for a friendly solution, the EUMC made, in essence, the following remarks:
According to the EUMC, the complainant should have sent a formal request in the same conditions requested in the general invitation to the Call for tender, that is, by registered letter only, to the address and contact person mentioned for submitting his offer. The EUMC stressed that, in the tendering procedures, the arrangements for the submission of tenders and of requests to participate are laid down by the contracting authority, which is free to choose an exclusive form of communication. A fortiori the request for information in relation to the tendering procedure should comply with the same requirement. This is because the registered letter as a means of communication will guarantee that the integrity of data and the confidentiality of the request are preserved before lodging a complaint. The EUMC believed that these formalities were not discriminatory and did not have the effect of restricting the access of economic operators to the information on the outcome of their offers.
Furthermore, the EUMC referred to the information it had already provided to the complainant on 14 July 2005 and regretted that this letter was considered by the Ombudsman as "not convincing".
The EUMC made reference to Article 100(1) of the Council Regulation (EC, Euratom) No 1605/2002 of 25 June 2002 on the Financial Regulation applicable to the general budget of the European Communities(12) ("the Financial Regulation"), which provides that "[t]he authorising officer shall decide to whom the contract is to be awarded, in compliance with the selection and award criteria laid down in advance in the documents relating to the call for tenders and the procurement rules." The EUMC also referred to Article 97(2) of the Financial Regulation and Article 138(l)(b) and (2) of the detailed implementing rules, which state that a contract may be awarded to the tender offering the best value, that is, the one with the best quality/price ratio.
The EUMC also referred to the case-law of the Community Courts according to which:
"for the purpose of identifying the economically most advantageous tender, each of the award criteria used by the contracting authority does not necessarily have to be of a purely economic nature, since it cannot be excluded that factors which are not purely economic may influence the value of a tender from the point of view of the contracting authority (...)"(13).
The EUMC stressed that, in the Open Call for Tender N 2004/02/13, it provided, in a fully transparent manner, all the award criteria and attached relative weightings. In the absence of a determination of quality/price ratio by the Contracting Authority, the technical quality and the price were assessed equally.
In addition, the EUMC emphasised that the complainant did not request, within the deadline which ran from 18 September to 3 November 2004, any clarifications on the ratio to be used.
Furthermore, a simulation of the use of other quality/price ratios such as 60/40, 70/30, 80/20, 90/10, 40/60, 30/70, 20/80, 10/90 indicates that, in all cases, the offer from the complainant would not have been selected and the offer from the Kurt Lewin Foundation would have been selected.
As regards the Ombudsman's alternative proposal for a friendly solution that the EUMC could consider "offering a reasonable compensation to the complainant", the EUMC referred to the case-law of the Court of Justice:
"in order for the Community to incur non-contractual liability, a number of conditions must be satisfied concerning the illegality of the conduct alleged against the Community institutions, the fact of the damage and the existence of a causal link between that conduct and the damage complained of (...)"(14).
Therefore, the EUMC was of the view that it should not envisage awarding financial compensation to the complainant as it did not make a manifest error of assessment in the choice of the selected tenderer and did not in any way infringe the Financial Regulation.
The EUMC provided the requested additional information (a) on the cost of the offer selected by the EUMC and on how the complainant's offer scored on various grounds compared with the winning bid, as well as (b) which quality/price ratio was used for the evaluation of the offers in a table on the evaluation of the complainant's bid and the awarded offer which had a price of EUR 11 990. The table presented average quality points of both the complainant and the winning bidder awarded on the basis of the following four criteria:
- verified competence and experience in the field of education research/maximum 40 out of 100 quality points;
- verified competence and experience of research on population groups in question/maximum 40 out of 100 quality points;
- verified competence and experience in European comparative issues in both fields/maximum 10 out of 100 quality points; and
- guarantees to deliver all products in English according to international publication standards/maximum10 out of 100 quality points.
The EUMC hoped that the information provided would satisfy the complainant and allow the Ombudsman to eliminate his provisional finding of maladministration.
The complainant's observations on the EUMC's reply to the Ombudsman's friendly solution proposalThe complainant informed the Ombudsman that he accepts his proposal for a friendly solution. The complainant indicated that he did not wish to make any further observations.
The complainant expressed his gratitude to the Ombudsman for his work on the present case and his appreciation for the fact that the institution of the European Ombudsman provides reliable safeguards for the transparency in the operations of the European Union.
THE DECISION
1 Preliminary remarkThe Ombudsman notes that in accordance with Article 33 of Council Regulation (EC) No 168/2007 of 15 February 2007 establishing a European Union Agency for Fundamental Rights(15) ("Regulation 168/2007"), Council Regulation (EC) No 1035/97 of 2 June 1997 establishing a European Monitoring Centre on Racism and Xenophobia(16) ("Regulation 1035/97") is repealed with effect from 1 March 2007. The EUMC has thus ceased to exist as of 1 March 2007. The role of the EUMC is thereafter carried out by the European Union Agency for Fundamental Rights ("FRA"). Cases dealt with by the Ombudsman involving the EUMC will therefore, after 1 March 2007, be handled by the FRA.
2 Alleged failure by the EUMC to reply to the complainant's request for further information concerning the outcome of Open Call for Tender N° 2004/02/132.1 The complainant submitted an offer in Open Call for Tender N° 2004/02/13. By letter dated 21 March 2005, Mr D., the Head of Research and Data Collection at the EUMC informed the complainant that his offer had not been accepted. Subsequently, the complainant wrote an e-mail to Mr D., requesting an explanation as regards the grounds for the refusal of his bid.
On 25 March 2005, Mr D. replied explaining that "[t]he reason for the rejection of the ERRC bid was the result of the evaluation by the selection committee on the basis of the quality criteria described in the tender specifications in relation to price (quality 50% - price 50%). If you require more detailed information, [Mr A.], our procurement officer, will provide you with it."
By e-mail of 29 March 2005 sent to Mr D., the complainant requested to know:
- which organisation or entity had been awarded the contract and what its cost offer was;
- the "rating grades and how [his] offer scored on various grounds compared with the winning bi[d]."
In his complaint to the European Ombudsman, the complainant alleged that he did not receive any response to his e-mail of 29 March 2005. He thus considered that the EUMC had failed to provide him with a suitable explanation for the rejection of his application.
2.2 In its opinion, the EUMC stated in summary that the request for information was not received by the appropriate person because it was (i) sent in the form of an e-mail and pointed out that it receives approximately 300 "spam" e-mails per day; and (ii) not addressed to the contact person designated by the EUMC in Mr D.'s e-mail to the complainant of 25 March 2005. The EUMC added that, in order to ensure timely registration and processing by its services, formal requests for information on procurement procedures should be sent by regular or registered mail and not by e-mail.
2.3 On 21 December 2006, the Ombudsman addressed a proposal for a friendly solution to the EUMC, suggesting that the EUMC should (i) reconsider providing the complainant with adequate information on "how [his] offer scored on various grounds compared with the winning bi[d]", bearing in mind that this was the information he had requested in his e-mail to the EUMC of 29 March 2005; (ii) adequately explain its position that the procedure at issue was transparent with respect to the establishment and application of a "simple quality/price ratio"; or (iii) in case it is unable to give such explanations, offer reasonable compensation to the complainant.
2.4 In its reply to the above friendly solution proposal, the EUMC provided the requested additional information on "how [the complainant's] offer scored on various grounds compared with the winning bi[d]" (emphasis by the Ombudsman) in a table on the evaluation of the complainant's bid and the awarded offer which had a price of EUR 11 990. The table presented average quality points of both the complainant and the winning bidder awarded on the basis of the following four criteria:
- verified competence and experience in the field of education research/maximum 40 out of 100 quality points;
- verified competence and experience of research on population groups in question/maximum 40 out of 100 quality points;
- verified competence and experience in European comparative issues in both fields/maximum 10 out of 100 quality points; and
- guarantees to deliver all products in English according to international publication standards/maximum10 out of 100 quality points.
2.5 As regards transparency of the procedure with respect to the establishment and application of a "simple quality/price ratio" , the EUMC made reference to Article 100(1) of the Financial Regulation, which provides that "the authorising officer shall decide to whom the contract is to be awarded, in compliance with the selection and award criteria laid down in advance in the documents relating to the call for tenders and the procurement rules". In this regard, the EUMC also referred to Article 97(2) of the Financial Regulation and Article 138(l)(b) and (2) of the detailed implementing rules, which state that a contract may be awarded to the tender offering the best value, that is, the one with the best quality/price ratio.
The EUMC also referred to the case-law of the Community Courts according to which:
"for the purpose of identifying the economically most advantageous tender, each of the award criteria used by the contracting authority does not necessarily have to be of a purely economic nature, since it cannot be excluded that factors which are not purely economic may influence the value of a tender from the point of view of the contracting authority (...)"(17).
The EUMC stressed that, in Open Call for Tender N° 2004/02/13, it had, in full transparency, provided all the award criteria and attached the relevant weightings. In the absence of a determination of quality/price ratio by the Contracting Authority, the technical quality and the price were assessed equally. In addition, the EUMC underlined that the complainant did not request, within the deadline which ran from 18 September to 3 November 2004, any clarifications on the ratio to be used. Furthermore, the EUMC referred to a simulation of the use of other quality/price ratios such as 60/40, 70/30, 80/20, 90/10, 40/60, 30/70, 20/80, 10/90 and indicated that, in all cases, the offer from the complainant would not have been selected and the offer from the Kurt Lewin Foundation would have been selected.
As regards the Ombudsman's proposal for a friendly solution, whereby the EUMC could consider "offering a reasonable compensation to the complainant", the EUMC referred to the case-law of the Court of Justice(18) and took the view that it should not envisage awarding financial compensation to the complainant, since it did not commit a manifest error of assessment in the choice of the selected tenderer and did not in any way infringe the Financial Regulation.
2.6 After having received the EUMC's reply to the Ombudsman's proposal for a friendly solution, t he complainant informed the Ombudsman that he accepted his proposal for a friendly solution and indicated that he did not wish to make any further observations.
The complainant expressed his gratitude to the Ombudsman for his efforts in the present case and his appreciation for the fact that the institution of the European Ombudsman provides reliable safeguards for transparency in the operations of the European Union.
2.7 In light of the above, the Ombudsman considers that, by providing additional (i) explanations concerning the transparency of the procedures and (ii) information on the points awarded to both the complainant's and the selected offer on the basis of each of the award criteria, the EUMC has given adequate explanations and information that accord with the Ombudsman's friendly solution proposal which has been accepted by the complainant.
2.8 Following the Ombudsman's initiative, it appears that a friendly solution to the complaint has been agreed between the EUMC and the complainant as regards this aspect of the complaint.
3 Alleged failure to establish and apply transparent award criteria in Open Call for Tender N° 2004/02/13 and related claims3.1 The complainant alleged that the EUMC had failed to establish and apply transparent award criteria in Open Call for Tender N° 2004/02/13. The complainant argued that the EUMC had failed to make the quality/price ratio public. The complainant also argued that the primary criteria for evaluating the applications appeared to be expertise-oriented, since the expertise-oriented criteria were given precise numerical points weightings, whilst no weighting was given to the quality/price ratio.
3.2 The complainant claimed that the EUMC should (i) annul contracts based on the Open Call for Tender N° 2004/02/13 and open a new Call for Tender; (ii) publicly acknowledge the acts of maladministration; and (iii) award damages to the complainant.
3.3 Based on the additional explanation provided by the EUMC referred to in point 1.5 above; the complainant's acceptance of the proposed friendly solution with the indication that he did not wish to make any further observations; and the Ombudsman's findings in points 1.7 and 1.8 above, the Ombudsman is of the view that no further inquiries are necessary into the second allegation and to the related claims.
4 ConclusionFollowing the Ombudsman's initiative, it appears that a friendly solution to the complaint has been agreed between the EUMC and the complainant and that, therefore, no further inquiries into the second allegation and the related claims were necessary. The Ombudsman therefore closes the case.
The Director of the FRA will also be informed of this decision(19).
Yours sincerely,
P. Nikiforos DIAMANDOUROS
(1) Regulation of the European Monitoring Centre On Racism and Xenophobia of 20 November 2002 laying down detailed rules for the implementation of the Financial Regulation of 20 November 2002 applicable to the Budget of the European Monitoring Centre on Racism and Xenophobia, which is available on the EUMC's website (http://fra.europa.eu/fra/material/pub/general/Imprulesfinancereg.pdf).
(2) See Case C-57/01 Makedoniko Metro [2003] ECR I-1091, paragraph 69.
(3) Cf. Case C-324/98 Telaustria and Telefonadress [2000] ECR I-10745, paragraphs 61-62.
(4) Cf. Case C-92/00 HI [2002] ECR I-5553, paragraph 46.
(5) Neither the complainant nor the EUMC has provided a complete copy of Open Call for Tender N° 2004/02/13 or its publication references. The EUMC has not contested that Annex 2 to the complaint constitutes a copy of that part of the Open Call for Tender N° 2004/02/13 which concerns the award criteria. It has also stated that "in the Open Call for tender 2004/02/13 the EUMC published all award criteria and attached relative weightings by assigning maximum possible points for the respective criteria."
(6) See Case C-57/01 Makedoniko Metro [2003] ECR I-1091, paragraph 69.
(7) Cf. Case C-324/98 Telaustria and Telefonadress [2000] ECR I-10745, paragraphs 61-62.
(8) See Case C-19/00 SIAC Construction [2001] ECR I-7725 paragraph 42.
(9) Cf. Case C-470/99 Universale-Bau and Others [2002] ECR I-11617, paragraphs 90-100.
(10) Cf. Case C-331/04 ATI EAC [2005] ECR I-10109, paragraphs 24, 28, 29.
(11) Cf. Case C-331/04 ATI EAC, cited above, paragraphs 24, 30 and 31.
(12) OJ 2002 L 248, p. 1.
(13) See Case T-148/04 TQ3 Travel Solutions Belgium v Commission [2005] ECR II-2627 , paragraph 51.
(14) Cf. Case T-13/96 TEAM v Commission [1997] ECR 983, paragraph 68; and Case C-87/89 Sonito v Commission [1990] ECR I-1981, paragraph 16.
(15) OJ 2007 L 53, p. 1.
(16) OJ 2007 L 151, p. 1.
(17) See Case T-148/04 TQ3 Travel Solutions Belgium v Commission [2005] ECR II-2627 , paragraph 51.
(18) Cf. Case C-87/89 Sonito v Commission [1990] ECR I-1981, paragraph 16 and Case T-13/96 Team SrL v Commission, paragraph 68.
(19) As noted in point 1 above, the EUMC ceased to exist as of 1 March 2007. The role of the EUMC will thereafter be carried out by the FRA. Since this decision has been adopted after that date, the Director of the FRA will be informed of this decision.